Crazy Weather and Playing Conditions
The last three months have put us back into the "Severe Drought" category. |
We are constantly making notes and changes to our irrigation system |
Driving Range Tees
Divot recovery after 14 days |
10 days after planting, the seed is doing very well |
around Thanksgiving (10 weeks after planting) - only if it is healthy to handle traffic. Preparation has also been underway to replant our two nursery greens. The "new nursery" suffered the same fate as #1 Green during the flood, and the "old nursery" was severely contaminated with bermudagrass and weeds. These greens are critical to our care of the regulation greens as they provide a source of identical grass that can be used for repairs, testing, and removing bermudagrass contamination. In addition, we are hoping that they will be used as supplemental short game practice areas.
The front portion of the practice putting green has traditionally struggled every summer. In my three summers at RCC we were only successful once in keeping grass here all year. The reason bentgrass stuggled in this area is due to several circumstances - with air movement, traffic, and heat being the three most difficult to overcome. We made the decision earlier this year to remove approximately 900 square feet of putting surface and to replace it with a more tolerant grass. In order to complete this process we stripped the entire area including the collar. The soil was the then amended, leveled, and prepared for planting. Also, short bump and run chips are allowed on the putting green for warm up and quick practice sessions. If you would like to practice pitch shots,bunker shots, or spend more time chipping please use the Practice Chipping Green located between #3 Green and #4 Tee.
Any good grass in the area was saved prior to preparing the area for new sod |
Current and Upcoming Events
- Preventative Weed and Disease Control - Herbicide applications will begin in the next two weeks to all areas of the course. The products will need to watered in following application - so the course may play extra wet for a week or so afterwards. Fungicide applications will take place on greens and zoysiagrass areas only.
- Tall Fescue - Preparations are underway to re-seed many already established areas and to plant several new areas to tall fescue - including the new parking area at the driving range tee and the rough on the left side of #13.
- Annual Flowers - Fall annual flower change out is already underway. All work will be completed by October 15th.
- Tree Removal - Goss Tree Service will be removing the large Live Oak near the ballroom entrance and our staff will begin working on Cedar Elms on several holes and a couple of large Ash trees between holes #6 and #7. All of these trees are safety hazards and have been inspected by a certified arborist before being selected for removal.
- Cart Path Repairs - Many of our cart paths have shifted with large changes in soil moisture. We are currently patching many places to prevent damage to carts.
- Planet Air Procedure - We completed our first "Planet Air Procedure" on Monday the 14th of September. The scheduled procedure will take place on October 12th.
- Irrigation Repairs - Similar to the cart paths, our irrigation pipes are breaking due to large shifts in the soil. Repairs are taking place daily.